3/4 of a sink

We now have three quarters of the sink plumbed and ready. Colin did the hard work for the plumbing and I did the standing back and saying how nice it looks.

By 3/4 of the sink I mean we have the faucet, and the small side ready, and the garbage disposal installed. The big side and the grey water system still have to be installed. Maybe this weekend.

It is a good thing we got the faucet installed. The record breaking cold temperatures here have caused many peoples pipes to freeze. So since we have a faucet-we can leave it dripping so that our pipes stay nice and unfrozen- which is important because we don't have a crawl space so it would be a difficult thing to fix if they did break.